Bathroom remodel: moving the water ins and outs

Project Hutchinson

The bathroom remodel is a slow project when I do everything myself.

Today I worked on finishing my drawers while also moving the plumbing for my sink. It’s hard to tell, but I cut out the 2″ ABS pipe drain on the left and moved it to the right. This mostly involved messing with stuff under the house. Tomorrow I’m going to learn how to to sold copper soldering and move the water inlets (seen on the left).

IMG_9663.JPG

Previous in Project Hutchinson
Bathroom Cabinets: Floating design
Next in Project Hutchinson
Bathroom remodel: drawers finished