{"id":3280,"date":"2013-07-05T21:21:30","date_gmt":"2013-07-06T05:21:30","guid":{"rendered":"http:\/\/www.corbinstreehouse.com\/blog\/2013\/07\/bathroom-remodel-moving-the-water-ins-and-outs\/"},"modified":"2021-11-06T14:14:20","modified_gmt":"2021-11-06T21:14:20","slug":"bathroom-remodel-moving-the-water-ins-and-outs","status":"publish","type":"post","link":"https:\/\/www.corbinstreehouse.com\/blog\/2013\/07\/bathroom-remodel-moving-the-water-ins-and-outs\/","title":{"rendered":"Bathroom Remodel: Moving the Water Ins and Outs"},"content":{"rendered":"<p id=\"top\" \/>\n<p>The bathroom remodel is a slow project when I do everything myself.<\/p>\n<p>Today I worked on finishing my drawers while also moving the plumbing for my sink. It&#8217;s hard to tell, but I cut out the 2&#8243; ABS pipe drain on the left and moved it to the right. This mostly involved messing with stuff under the house. Tomorrow I&#8217;m going to learn how to do copper soldering and move the water inlets (seen on the left).<\/p>\n<p><a href=\"\/blog\/wp-content\/uploads\/2013\/07\/IMG_9663.jpg\"><img loading=\"lazy\" decoding=\"async\" src=\"\/blog\/wp-content\/uploads\/2013\/07\/IMG_9663-tm.jpg\" width=\"500\" height=\"375\" alt=\"IMG_9663.JPG\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The bathroom remodel is a slow project when I do everything myself. Today I worked on finishing my drawers while also moving the plumbing for my sink. It&#8217;s hard to tell, but I cut out&#8230; <a class=\"read-more\" href=\"https:\/\/www.corbinstreehouse.com\/blog\/2013\/07\/bathroom-remodel-moving-the-water-ins-and-outs\/\">[read more]<\/a><\/p>\n","protected":false},"author":1,"featured_media":3278,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[12,11],"tags":[197,82,196,271,104,73],"class_list":["post-3280","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-diy-home-remodeling","category-woodworking","tag-cabinets","tag-diy","tag-master-bathroom-remodel","tag-project-hutchinson","tag-remodel","tag-woodworking"],"jetpack_featured_media_url":"https:\/\/www.corbinstreehouse.com\/blog\/wp-content\/uploads\/2013\/07\/IMG_9663.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.corbinstreehouse.com\/blog\/wp-json\/wp\/v2\/posts\/3280","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.corbinstreehouse.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.corbinstreehouse.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.corbinstreehouse.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.corbinstreehouse.com\/blog\/wp-json\/wp\/v2\/comments?post=3280"}],"version-history":[{"count":3,"href":"https:\/\/www.corbinstreehouse.com\/blog\/wp-json\/wp\/v2\/posts\/3280\/revisions"}],"predecessor-version":[{"id":5930,"href":"https:\/\/www.corbinstreehouse.com\/blog\/wp-json\/wp\/v2\/posts\/3280\/revisions\/5930"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.corbinstreehouse.com\/blog\/wp-json\/wp\/v2\/media\/3278"}],"wp:attachment":[{"href":"https:\/\/www.corbinstreehouse.com\/blog\/wp-json\/wp\/v2\/media?parent=3280"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.corbinstreehouse.com\/blog\/wp-json\/wp\/v2\/categories?post=3280"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.corbinstreehouse.com\/blog\/wp-json\/wp\/v2\/tags?post=3280"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}