I’ve been working quite a bit on our upstairs remodel project.

I removed an old closet, and installed lighting in the ceiling. This helps tremendously with the look and feel of the room; it was always dark and shady, mainly because there was no built-in lighting. I also framed the wall in preparation for a door and drywall:

IMG_0815.jpg

IMG_0816.jpg

I removed the old drywall on the side. I’m planning on building built-in dressers.

IMG_0817.jpg

The back window was a single half-triangle. It look completely out of place and asymmetric, and because the windows didn’t open, it would get really hot and stuffy in the room. So, I framed out an opening for another half-triangle, and two lower windows that would open:

IMG_0823.jpg

Here’s the same wall with the windows installed:

IMG_0928.jpg

Unfortunately, the new window (on the left) didn’t have the same frame; it was wooden, and is all they offered. I had to end up building a matching wooden frame for the old window.

The other half of the upstairs already had matching triangle windows, but the windows underneath were slat-opening. They are horribly energy inefficient, and two of the four didn’t open. I removed them, and you can see the replacements waiting for me to put them in:

IMG_0919.jpg

Finally, there were two more opaque windows that didn’t open. One was cracked, and the other one I accidentally cracked while messing with the drywall by it, so we had to get some new ones. We went with vertically opening ones, but the main problem was installing them. There wasn’t quite enough space to use the latter, so I had to drop a climbing rope from the chimney and hang from it to install the windows. The hardest part was lugging back up the 3/4 plywood and nailing it back on (all, by myself!). It was a nightmare to do, and the project isn’t 100% done, as I still have to put trim around the windows.

IMG_0933.jpg

Before the siding went up:

IMG_0937.jpg

Anyways, I’ve been doing the drywall work, and starting to tape and mud.

Previous Post
Wedding Boxes
Next Post
Cal Muni Weekend 2008

Leave a Reply

avatar
500
  Subscribe  
Notify of

(c) 2008-2018 Corbin Dunn

Privacy Policy

Subscribe to RSS feeds for entries.

58 queries. 0.349 seconds.

Log in